SCOPE OF WORK
Responded to a fire emergency in the English wing at New Palestine High School
Temporary board up was completed quickly to confine damage
Complete cleaning of all surfaces within the entire school: including textbooks and other teaching tools, inside and outside of all lockers, kitchen and all kitchen tools and equipment, gymnasium bleachers, theater and all seating, HVAC duct system and locker rooms, just to name a few specific areas.
In the English wing, a complete renovation of (1) room and entire hallway and the cleaning of the other classrooms within this area
Installed a new ceiling and grid system in the hallway
Installed a new HVAC system in the classroom
Complety painted the interior of the English wing
Installed a new floor coverings and furniture in the (1) damaged classroom
Cleaned all floor coverings in the rest of the hallway and classrooms
VALUE OF WORK
< $300,000
TIME FRAME
Project completed within 30 days of start